Waterproofing
Approved membranes, wall-adjacent drains and wet-room boards
A cheap product substituted into your walls is a future leak. Which waterproofing products GVK actually allows — and why they only work as tested, matched systems.
Why this matters to you
Only tested, matched products go into your walls — because a cheap substitution is a future leak.
- Industry-approved membranes installed as complete systems
- Wall-adjacent drains proven with the exact membrane used
- No incompatible mixing that quietly voids the protection
Under GVK, you can't just waterproof with "something that looks waterproof." Only industry-approved products may be used, and they must be installed as complete, matched systems per the supplier's documented instructions. That single rule removes a huge share of failures.
The approved membrane families
GVK recognises several categories of tätskikt (waterproof layer), all of which must be industry-approved:
- Plastic (vinyl) mat — used both as the sealing layer and finished surface, or as a sealing layer beneath ceramic tiles.
- Sealing-foil systems — sheet membranes bonded to the substrate.
- Liquid-applied systems — built up in coats to a controlled film.
- Tight-board systems — approved waterproof boards.
Each is a *system* — membrane, collars, adhesives and boards from a compatible, approved kit. Where two different membrane types meet, at least one responsible supplier must provide a written mounting instruction for that specific combination.
Wall-adjacent drains and wet-room boards
A wall-adjacent floor drain (väggnära golvbrunn) — one set closer than 200 mm to a wall — must be approved for near-wall placement *together with the specific waterproofing system* it's used with. Only proven drain-and-membrane combinations may be paired. Wet-room boards (våtrumsskivor) must likewise be approved, and adhesives on plastic mat matched to the system.
The vapour-resistance rule
A membrane installed under ceramic tiles must have a vapour-passage resistance exceeding one million s/m, unless a formal moisture-safety design says otherwise — so moisture can't accumulate behind the tiles.
What M5 brings to Dubai
We use only tested, approved systems, installed complete and matched — never a cheaper component slipped into a system it was never tested with. It's invisible in the finished room, and it's exactly where corners get cut elsewhere.
Official source: this is M5's plain-language summary, not the official text. For the full rules see GVK — gvk.se.
Want this standard on your project?
Request a quote or arrange a free site visit. One contact person, documented standards, real warranties — from day one.
Request a quote